New dryer installation with integrated controls at Local Asphalt Plant.
We replaced the existing 45kW drive motor with four 15kW motors on rollers.
The installation required integrating with the existing control system.
We installed a new Soft Start remote panel with separate overloads to each motor.
We also added alarm for fault and drum slip.
Let SEC Electrical be your partner in unlocking the full potential of your industrial processes.